Execution Methodology

  • Reference P&ID’s & Technical Specifications from Customer
  • BOM calculations from P & IDs
  • Valve Sizing
  • Preparation of Datasheets
  • 3D Model/ Final CAD Drawings
  • Manufacturing based on final approved Drawings & Datasheets

Fabrication Procedure

  • Approval of GA Dwgs
  • Fabrication of Frame
  • Supporting arms
  • Frame Inspection
  • Pipe Fitting
  • Instrument Assembly
  • Piping Inspection
  • Painting
  • Final Inspection
  • Packing
  • Transportation

Noted Projects (End Users)

VISA Steel

  • Nitrogen Pressure Regulating Skid

SAIL IISCO, Burnpur

  • Bottom Stirring System (6 Lines) - 3 Nos
  • Machine Cooling Water Supply & Return
  • Machine Cooling Water Supply
  • Machine Cooling Water Return

Jindal Steel & Power Ltd, Angul

  • Laddle Bottom Stirring System for EAF-LHF- 4 Nos

Bhushan Steel Limited, Meramandali

  • Nitrogen Purging Panels for MHS – 8 Nos

Hindalco Industries

  • Fume Treatment Center – Mahaan Aluminum
  • Fume Treatment Center – Aditya 1 Aluminum
  • Fume Treatment Center – Aditya 2 Aluminium
  • Fume Treatment Center – Boyne Smelter, Australia
  • Fume Treatment Center – Renukoot

Euro Projects – Dubai

  • Ramadi Glass – 1 Valve Rack